Our Process

From First Conversation
to Final Handover

Architecture is a process, not a product delivered overnight. At ARKA, we follow a structured workflow that moves projects from initial concept through completed construction. Each phase has defined deliverables, client review points, and approval gates.

01

Client Briefing

02

Site Analysis

03

Concept Development

04

Design Development

05

Approvals & Documentation

06

Execution Coordination

07

Project Handover

01

Client Briefing

Duration: 1-2 Weeks

We begin every project with comprehensive understanding of your requirements, constraints, and aspirations.

What Happens

  • Initial consultation meeting
  • Site visit and documentation
  • Program requirements discussion
  • Budget and timeline alignment
  • Preliminary scope definition

Deliverables

  • Project brief document
  • Site photographs and measurements
  • Regulatory summary
  • Preliminary schedule

Your Role

Share your requirements, constraints, and aspirations. The more we understand your needs, the better we can serve them.

02

Site Analysis

Duration: 1-2 Weeks

Thorough understanding of site conditions, constraints, and opportunities that will inform design decisions.

What Happens

  • Detailed site survey
  • Topographical documentation
  • Solar and wind analysis
  • Neighboring context study
  • Utility and access assessment
  • Regulatory constraints mapping

Deliverables

  • Site analysis report
  • Constraint diagrams
  • Opportunity mapping
  • Regulatory compliance summary

Your Role

Provide access to site and any existing documentation (previous surveys, title documents, utility records).

03

Concept Development

Duration: 2-4 Weeks

Exploration of design options responding to site conditions, program requirements, and client aspirations.

What Happens

  • Design options exploration
  • Massing studies
  • Preliminary floor plans
  • Initial material concepts
  • 3D visualization of options

Deliverables

  • 2-3 design options
  • Schematic floor plans
  • Massing diagrams
  • Preliminary 3D views
  • Concept presentation

Your Role

Review options and provide feedback. Select preferred direction for development.

04

Design Development

Duration: 4-8 Weeks

Refinement of selected concept into detailed design with material selections and technical coordination.

What Happens

  • Selected concept refinement
  • Detailed floor plans with dimensions
  • Section and elevation development
  • Structural system coordination
  • MEP layout integration
  • Material selection and specification
  • Detailed 3D visualization

Deliverables

  • Developed floor plans
  • Building sections
  • Elevations
  • Material boards
  • Rendered views
  • Preliminary cost estimate

Your Role

Approve developed design. Finalize material selections. Confirm budget alignment.

05

Approvals & Documentation

Duration: 4-8 Weeks

Production of complete construction documents and coordination with regulatory authorities.

What Happens

  • Construction drawing production
  • Structural engineering coordination
  • MEP engineering coordination
  • Regulatory submission preparation
  • Authority liaison and approval
  • Tender document preparation

Deliverables

  • Complete construction drawing set
  • Structural drawings
  • MEP drawings
  • Specifications
  • Bill of quantities
  • Regulatory approvals

Your Role

Review and approve final documents. Sign regulatory submissions.

06

Execution Coordination

Duration: Project-Dependent

Construction oversight ensuring design intent is preserved through building delivery.

What Happens

  • Contractor selection support
  • Pre-construction meetings
  • Regular site observations
  • RFI response and clarification
  • Submittal review
  • Progress monitoring
  • Quality verification
  • Change order management

Deliverables

  • Site observation reports
  • Progress photographs
  • RFI responses
  • Submittal approvals
  • Change documentation

Your Role

Attend key site meetings. Approve changes and selections.

07

Project Handover

Duration: 2-4 Weeks

Final verification, documentation, and transfer of completed project to client.

What Happens

  • Punch list development
  • Deficiency correction verification
  • Final inspections
  • Warranty documentation
  • As-built drawing collection
  • Maintenance manual compilation
  • Key handover

Deliverables

  • Punch list and completion certificates
  • As-built drawings
  • Warranty documents
  • Maintenance guidelines
  • Project archive

Your Role

Participate in final walkthrough. Accept completed project.

What Sets ARKA's Process Apart

Our structured approach protects your investment and ensures design intent is preserved through construction.

Defined Milestones

Every phase concludes with specific deliverables and client approval. No ambiguity about what you receive or when.

Integrated Services

Architecture, interiors, visualization, and project management under one process. No handoff gaps between consultants.

Documentation Standards

Our drawings are complete and coordinated. Contractors can build from them directly. This protects budgets and schedules.

Continuous Communication

Regular updates throughout every phase. You always know where your project stands.