A
ARKA
Architecture & Design
Loading0%
Insights

Perspectives on Architecture, Design & Construction

Thoughts and analysis from ARKA on architectural practice, design thinking, and the realities of building in Pakistan.

Showing 18 articles

Studio team working together on laptops
Studio News

We Ran a Studio on Folders and WhatsApp for a Decade. Then We Put It All on One System

An honest account of moving ARKA off shared drives, spreadsheet BOQs and chat groups onto Ofivio: what changed in drawings, approvals, stages and billing, and what it asked of us in return.

Ar. Ahsan Raza Khokhar
8 min read
Sep 12, 2026
Bookkeeping with a calculator and printed figures
Construction

From a 4,000-Row Excel BOQ to a Bill We Can Actually Defend

Every quantity surveyor in Pakistan knows the fear of a spreadsheet nobody fully trusts. Here is how our bill of quantities, tendering, valuations and site records moved onto one connected record.

ARKA Design Team
8 min read
Sep 12, 2026
Hands typing on a laptop at a desk
Industry

Contracts, Fees and Getting Paid: The Half of Architecture Nobody Teaches

Design is taught for five years. Invoicing, dual fee structures, payroll and chasing payments are taught to nobody. Here is how ARKA moved the business half of the practice onto one connected ledger.

Ar. Ahsan Raza Khokhar
8 min read
Sep 12, 2026
Architect and client shaking hands across a desk
Industry

Architect Fees in Pakistan: What You Are Actually Paying For

Two architects quote very different fees for the same house. The difference is usually scope, not greed. Here is how to read a fee proposal before you compare numbers.

Ar. Ahsan Raza Khokhar
4 min read
Sep 12, 2026
Spreadsheet of quantities beside a calculator
Construction

How to Read a BOQ Before You Sign With a Contractor

A Bill of Quantities is the most useful document in a construction contract and the least read. Here is what homeowners should check before agreeing to a rate.

Ar. Ahsan Raza Khokhar
3 min read
Sep 12, 2026
Architect sketching plans with a scale rule
Architecture

The Design Stages of a House Project, Explained for Clients

From the first sketch to construction drawings, a house moves through distinct design stages. Knowing what each stage decides helps you give the right feedback at the right time.

Ar. Ahsan Raza Khokhar
3 min read
Sep 12, 2026
Architect's laptop beside printed drawing sheets
Architecture

Managing Drawing Revisions Without Losing Control of a Project

When the contractor builds from an old drawing, the mistake is set in concrete. Here is how disciplined revision control and transmittals keep everyone on the current set.

ARKA Design Team
3 min read
Sep 12, 2026
Pen signing on a signature line
Architecture

Client Approvals and Variations: Stopping Design Changes From Derailing Budgets

Changes are part of every project. Unrecorded changes are what break budgets and relationships. Here is how clear approvals and a variation process protect clients.

Ar. Ahsan Raza Khokhar
3 min read
Sep 12, 2026
Calculator, coins and a ledger on a desk
Construction

Interim Payment Certificates: Paying Your Contractor Only for Work Done

Advance payments and round-figure instalments are the fastest way to lose control of a construction budget. An interim payment certificate links every payment to measured work.

ARKA Design Team
3 min read
Sep 12, 2026
Site worker making notes on a clipboard
Construction

Daily Site Reports: The Habit That Keeps Construction on Track

A short record written every day on site prevents more disputes than any contract clause. Here is what a useful daily site report contains and why clients should ask for one.

ARKA Design Team
3 min read
Sep 12, 2026
Close-up of steel reinforcement bars
Construction

Procurement on Building Projects: Buying Materials Without Overpaying or Waiting

Material purchasing decides a large share of construction cost and most of the delays. A simple procurement process keeps prices fair and the site supplied.

ARKA Design Team
3 min read
Sep 12, 2026
House model with a set of keys
Construction

Snag Lists and Handover: What to Check Before You Move In

The weeks before handover decide how your house performs for years. A structured snag list catches defects while the contractor is still on site to fix them.

ARKA Design Team
3 min read
Sep 12, 2026
Design team meeting in a studio
Industry

From WhatsApp Groups to One System: How Architecture Studios in Pakistan Are Getting Organised

Most studios still run on AutoCAD folders, Excel BOQs and chat groups. Here is what changes when drawings, approvals, site records and accounts live in one place.

Ar. Ahsan Raza Khokhar
3 min read
Sep 12, 2026
Modern house at dusk
Architecture

Site Orientation in Pakistani Climate: Why Your Plot Placement Matters

In Lahore's extreme summers, building orientation can reduce cooling loads by 30% or more. Here's what every homeowner should understand before finalizing floor plans.

Ar. Ahsan Raza Khokhar
8 min read
Nov 15, 2024
Calculator and pencil on a desk
Construction

Cost Planning for Construction: What Pakistani Homeowners Get Wrong

Construction budgets fail not from expensive finishes, but from poor planning. Understanding the true cost structure of residential construction prevents financial surprises.

Ar. Ahsan Raza Khokhar
10 min read
Oct 28, 2024
Designer drafting plans, seen from above
Interiors

Interior Design vs. Architecture: Understanding the Relationship

Interior design is not decoration applied after construction. It is spatial design at a different scale. Here's why the two disciplines must work together.

ARKA Design Team
6 min read
Oct 10, 2024
Blueprint with a wooden ruler
Architecture

Residential Planning Mistakes That Are Expensive to Fix

Some design errors cost paint to correct. Others require demolition. These are the residential planning mistakes you cannot afford to make.

Ar. Ahsan Raza Khokhar
12 min read
Sep 22, 2024
Towers under construction with cranes
Industry

The State of High-Rise Development in Lahore: 2024 Perspective

Lahore's skyline is transforming. From DHA to Gulberg, vertical development is reshaping the city. What's driving this shift and what does it mean for architecture?

Ar. Ahsan Raza Khokhar
15 min read
Sep 5, 2024

Want to contribute?

Share your insights on architecture and design with our community.

Get in Touch

ARKA Assistant

Architecture & Design Help

Powered by ARKA Services & Architects